i30 Builders · McLendon-Chisholm, TX

Built-In Cabinets and Carpentry in McLendon-Chisholm

We design and build custom built-ins in McLendon-Chisholm, drawn and cut to fit your walls. When one needs a permit, we pull it.

Permits handled. Written scope and price before any deposit.

Get a written estimate

Four fields. We call back within one business day to set up the site visit.

GL + umbrella coverage
$1M + $1M
Workmanship warranty
1-yr
Cities served
33

Do built-in cabinets need a permit in McLendon-Chisholm?

The city requires permits and inspections on renovation work, and it prices remodel permits by the square foot. A built-in that adds lighting or outlets, or takes out a wall, is permit work with an electrical permit on top. A piece that is only shelves and doors is a question we put to the city before we start.

What the city asks of any renovation

Read from the city’s own documents on the dates linked. Codes and fees change and city staff interpret them, so we confirm for your address before we pull the permit.

The fee lines carpentry can touch

From the city's Fees and Charges schedule, effective March 24, 2026. These are city fees, not our price.

Read from the city’s own documents on the dates linked. Codes and fees change and city staff interpret them, so we confirm for your address before we pull the permit.

Inspections and how long a permit lasts

Read from the city’s own documents on the dates linked. Codes and fees change and city staff interpret them, so we confirm for your address before we pull the permit.

McLendon-Chisholm Questions

What people in McLendon-Chisholm ask us

Do I need a permit for a built-in bookcase in McLendon-Chisholm?

The city requires permits on renovation projects. A bookcase that is only shelves and doors is a question we put to the city first. Add lighting, an outlet or a wall that comes out and it is permit work.

My built-in has lights and outlets. What changes?

That is an electrical permit on top of the building permit, pulled by a licensed electrician who is registered with the city.

Do you have to be registered with the city?

Yes. McLendon-Chisholm will not issue a permit until the general contractor and every trade on the job are registered.

How long does a built-in take?

The clock starts when you approve the drawings and the shop builds the pieces. Setting one wall of shop-built cabinets usually takes 3 to 5 working days on site, and a paneled room takes 1 to 3 weeks. A permit, when one is needed, comes before any of it.

How do you price built-ins in McLendon-Chisholm?

We measure the room, talk through the piece, and put the price in writing. Size, wood species, paint or stain, doors and drawers, and any wiring move it most. The price does not change unless the scope does.

Get a written estimate in McLendon-Chisholm

Tell us what you want built and roughly how big. We check the city and HOA rules for your address and price the scope in writing.

indicates a required field

Step 1 of 2: Project info

Project Type (required)
  • Free site visit
  • Written scope & price
  • No obligation
  • Reply in 1 business day