i30 Builders · Break Room Remodels

Break Room Remodels

Cabinets, counters, sink, and power in one room, built around the hours your staff use it.

Permits + inspections handled · Written scope before deposit

Free site visit · written scope · lump-sum price

Rated 5.0 on Google$1M GL + $1M Umbrella1-year workmanship warranty

A break room delivered by i30 Builders in Dallas-Fort Worth: a long island with a dark mitered top over a woodgrain panel, a hexagon tile backsplash with floating shelves, and full-height casework beyond.

Get a written estimate

Four fields. We call back within one business day to set up the site visit.

Who remodels office break rooms in Dallas-Fort Worth?

i30 Builders, a general contractor based in Royse City, TX, remodels employee break rooms and staff kitchenettes across Dallas-Fort Worth and East Texas. Cabinets, counters, sink relocation and dedicated power are handled in one room, built around the hours your staff use it. Each job is scoped and priced per project after a site walk, lump sum from a written scope before any deposit, with no published starting price, and we pull the permits and schedule the inspections.

Pricing
Per project after a site walk, lump sum. No published starting price
Permits
Permits and standard city inspections included
Insurance
$1M GL + $1M Umbrella, certificate on request
Warranty
One-year workmanship warranty, in writing
Where
Dallas-Fort Worth and East Texas

Updated

Start Here

A break room is priced by the scope, not the square footage.

A break room is 200 to 400 square feet with a sink in it. Three things set the price: whether the sink stays where it is, whether the appliances get their own circuits, and whether we work nights so your staff keep the room during the day.

Answer those three and you have your number. The tape measure does not decide it.

The published standards are on the cost page.

Four Versions of This Job

Tell us which one you are asking for.

Refresh, plumbing stays put

Paint, new flooring, new counter, cabinet doors or a full cabinet swap in the existing footprint. No wall moves, no re-routed supply or waste. The fastest version of this job and the cheapest.

Rebuild in place

Full millwork replacement, new counters, new sink and faucet in the same location, new lighting, and dedicated circuits for the appliances that keep tripping the shared one. New ceiling tile where the old grid is stained.

Reconfigure

The sink moves, the run gets longer, or the room absorbs adjacent square footage. Supply, waste, and vent get re-routed, which brings in permits, a plumber, and inspections that the first two tiers avoid.

Add the appliances properly

Dishwasher, ice maker, or a second refrigerator wired and plumbed on their own, rather than run off an extension cord and a tee fitting. This is the part most break rooms actually need and most quotes leave out.

What Moves the Number

Up and down, before you ask for a quote.

Pushes price up

  • Relocating the sink, which is three services to re-route rather than one
  • Dishwasher or ice maker: new supply, a drain, and a dedicated circuit
  • Dedicated circuits for microwaves and refrigerators on an already loaded panel
  • Accessible clearances and reach ranges the existing layout does not meet
  • After-hours and weekend work so staff keep the room during the day
  • Replacing a stained ceiling grid and the lighting in it

Keeps price down

  • Leaving the sink exactly where it is
  • Stock cabinet sizes instead of a custom millwork order
  • Laminate counters rather than quartz or solid surface
  • Reusing a sound ceiling grid and swapping only the tile
  • One shutdown week instead of six weeks of night work

Delivered · Longview, TX

A staff break room and two employee restrooms, in a building that never closed.

A state office building in Longview needed its break room and both employee restrooms gutted and refinished. The building could not stop operating for it, so the work ran after hours, on weekends, and over holidays.

The break room was the full version of this scope, not a refresh: custom cabinets, custom laminate counters, all new plumbing, all new cove base, and all new LVP. The restrooms took tile wainscot, non-slip flooring, commercial fixtures in accessible stall layouts, HDPE partitions, and LED lighting. All three rooms were sequenced into one mobilization so the tenant absorbed a single disruption instead of three.

$62,000 across all three rooms, scope and price locked in writing before deposit, no change orders during construction.

Common Questions

Break room remodel questions, answered

What does a commercial break room remodel cost?

Most break rooms are small enough that fixed costs, not the floor area, set the price, so each one is scoped and priced per project after a site walk. Where you land is scope: a refresh with the plumbing staying put sits at the bottom, a full rebuild with custom millwork, new plumbing, and new flooring sits higher. The published per-square-foot standards are on the cost page.

How soon can you start?

A site walk within the week, and a written scope back within five business days of it. From there the schedule is set by two things: permit review if the scope touches plumbing or electrical, and millwork lead time on the cabinets. We build the calendar backward from the date you need the room back.

Can you remodel our break room without shutting the office down?

Yes, and it is the normal case. We gutted and refinished a staff break room and two employee restrooms inside an occupied state office building in Longview, working after hours, weekends, and holidays so the building never lost a working day. The whole contract came to $62,000 across all three rooms.

Do we need a permit for a break room?

It depends on the scope, not the room. Paint, flooring, and swapping cabinets in place generally does not. Moving the sink, adding a dishwasher or an ice maker, running new circuits, or touching a wall generally does, because that is plumbing and electrical work an inspector has to sign. We tell you which side your scope lands on at the walk, before you commit to anything.

What drives the price up the most?

Moving the sink. Everything else in a break room is finish work. The sink is supply, waste, and vent, and relocating it means opening the floor or the wall to re-route all three, which pulls in a plumber, a patch, and an inspection. Keep the sink where it is and the same room finishes for meaningfully less.

Does the new break room have to be accessible?

We design to the standard that applies and confirm it with the reviewing authority before the millwork is ordered. On a break room that usually means clear floor space, reach ranges at the sink and counter, and knee clearance where the sink is meant to be used seated.

Project Proof

Related Case Studies

View All Case Studies
Office Restrooms & Break Room, Gut & Remodel, Longview, TX

Longview, TX

Office Restrooms & Break Room, Gut & Remodel

Full gut-and-remodel of two employee restrooms and the staff break room in an occupied state office building in Longview. Demo of existing finishes, all new plumbing from rough-in through fixtures, tile wainscot and non-slip flooring in the restrooms with HDPE partitions and accessible stall layouts, custom cabinets and laminate counters over new LVP in the break room, and new cove base, paint, trim and LED lighting throughout.

Read full case study
Pediatric Clinic Build-Out, Mansfield, TX

Mansfield, TX

Pediatric Clinic Build-Out

Full interior build-out of a pediatric clinic in Mansfield, taken back to bare structure with the ceiling opened up, then rebuilt. Partition walls were framed to the taped floor layout, and MEP was coordinated and inspected overhead before anything closed up. Exam rooms and the corridor were finished in plank flooring with stained trim and doors, plus casework, lighting and interior signage.

Read full case study

Recent Work

A look at what we build.

View the Full Gallery
Commercial break room island & casework, DFWCommercial millwork, navy casework, DFWCommercial millwork, gray oak run, DFWQuartz waterfall front desk, MansfieldSlat-clad millwork & service windowsQuartz ledge over walnut slat millworkMarble waterfall reception deskCalacatta quartz reception & archwayRestaurant & café build-outGray quartz reception & walnut slat wallOffice reception build-outFitness amenity build-out

Prefer to give us the details now?

Tell us the room, whether the sink is staying where it is, and what your team needs it to do. We price the scope, not the square footage.

indicates a required field

Step 1 of 2: Project info

Project Type (required)
  • Free site visit
  • Written scope & price
  • No obligation
  • Reply in 1 business day