Commercial paint / flooring refresh
$28/SF
$25,000 minimum
Paint, flooring, minor repairs baseline.

Real Standards · 2026
A break room is small enough that the project minimum, not the square footage, is usually the price. On a refresh that holds below 892 SF, on a full rebuild below 384 SF. Here are the standards both come from.
paint / flooring refresh
$28/SF
$25,000 minimum
Light office
$65/SF
$25,000 minimum
Standard office
$95/SF
$45,000 minimum
Typical break room
200 to 400 SF
minimum usually governs
Where the Minimum Takes Over
| Standard | Rate | Project minimum | Minimum governs below |
|---|---|---|---|
| Commercial paint / flooring refresh | $28/SF | $25,000 minimum | 892 SF |
| Light office TI | $65/SF | $25,000 minimum | 384 SF |
| Standard office TI | $95/SF | $45,000 minimum | 473 SF |
A typical employee break room is 200 to 400 SF, which sits below the crossover on every standard above. Budget the project minimum, and let the scope decide where you land past it.
Break Room Scopes
$28/SF
$25,000 minimum
Paint, flooring, minor repairs baseline.
$65/SF
$25,000 minimum
Light partitions, paint, flooring, electrical allowance.
$95/SF
$45,000 minimum
Typical office buildout baseline.
All i30 Builders full-project prices include normal mobilization, ordinary protection of adjacent areas, labor, standard materials listed in the scope, project coordination, normal cleanup, and a one-year workmanship warranty on the listed scope. Appliances, furniture, landlord fees, and specialty inspections are separate line items, called out explicitly in the written scope. The full commercial table is on the tenant improvement cost page.
What Drives the Final Number
Pushes price up
Keeps price down
Common Cost Questions
The project minimum, and up from there on scope. On a refresh the minimum governs below roughly 892 SF. On a full rebuild with new cabinets and counters it governs below about 384 SF, so a larger room carrying a heavier scope can climb past it. Bring us the room and the scope and you get a written number.
Appliances, furniture, landlord fees, and any specialty inspection your building requires. Those are real costs and we call them out as their own lines in the written scope rather than hiding them in an allowance. What is in the number is the construction: demo, millwork, plumbing, electrical, finishes, permits, inspections, and cleanup.
Whether the sink moves. Everything else in a break room is finish work that a good crew can price tightly. The sink is supply, waste, and vent, and moving it means opening the floor or the wall to re-route all three, then a patch and an inspection. Keep the sink and the same room finishes for meaningfully less.
Yes. We gutted and refinished a break room and two employee restrooms inside an occupied state office building in Longview, working after hours, weekends, and holidays. The building never lost a working day and the contract came to $62,000 across all three rooms. After-hours work carries a premium and we quote it as its own line rather than burying it.
Yes. Written scope, locked at signing. Change orders happen only if you ask for a scope change, and they are priced and approved in writing before anyone starts on them.
All i30 Builders full-project prices include normal mobilization, ordinary protection of adjacent areas, labor, standard materials listed in the scope, project coordination, normal cleanup, and a one-year workmanship warranty on the listed scope.