i30 Builders · Residential

Custom Bathroom Remodeling in Rockwall and DFW

Primary and guest baths, taken back to the studs and rebuilt to a plan. Not a tub-to-shower kit, and not a cosmetic refresh.

Measured and built for your house · Written scope and locked price before any deposit · One-year workmanship warranty · Financing available

Free site visit · written scope · lump-sum price

Rated 5.0 on Google$1M GL + $1M Umbrella1-year workmanship warranty

A remodeled bathroom with a sage double vanity, brass fixtures and oval mirrors, and a curbless walk-in shower with tiled niches.

Get a written estimate

Four fields. We call back within one business day to set up the site visit.

GL + umbrella coverage
$1M + $1M
Workmanship warranty
1-yr
Cities served
33

Who does custom bathroom remodels in Dallas-Fort Worth?

i30 Builders, a general contractor based in Royse City, TX, does custom primary and guest bathroom remodels, mid-grade to high-end for homeowners across Dallas-Fort Worth, centered on Rockwall, Collin, Hunt and Kaufman counties. Baths are taken back to the studs and rebuilt to a plan, with the waterproofing tested before tile. Every job is measured and designed for the house, then priced in writing after a site walk, before any deposit, with permits handled.

Pricing
Written price after a site walk, before any deposit
Permits
Handled by us
Warranty
One-year workmanship warranty, in writing
Where
Dallas-Fort Worth, centered on Rockwall, Collin, Hunt and Kaufman counties

Updated

The Work

Bathrooms we have built.

Get a written estimate
A frameless glass shower with marble-look tile, a built-in bench, a niche and a hex tile floor.
A primary bathroom with stone-clad walls, a walk-in shower with a lit niche and bench, and a floating walnut double vanity.
A marble primary bath with a freestanding tub, a vanity with a makeup station, and a walk-in shower beyond.
A large glass-enclosed shower with a bench and niche, and a freestanding tub with a floor-mounted brass filler.

Start Here

What you pay for in a shower is behind the tile.

A bathroom is a small room with a great deal of trade work in it: plumbing, electrical, ventilation, waterproofing, tile, glass and stone, all in a few square feet and in a fixed order. That work costs roughly the same whether the room is modest or exceptional, which is why a small, cheap bathroom is the one that goes badly. The budget is gone before the finishes are.

It is also the room where a shortcut stays hidden longest. A shower that fails, fails behind the tile, years later, and the repair starts with demolition. The waterproofing and the slope to the drain are the parts nobody sees and the parts that decide whether the room lasts.

So we plan the room before anything comes out, build all of it properly, and name every material in writing. If yours is new paint, a vanity swap or a shower insert, that is not work we take, and we will say so up front.

How the planning works

Measured, drawn and picked before anything comes out.

  1. Step 1

    Walk and measure

    Where the drains are, what the floor is, how the room vents, and whether the shower can go curbless. That sets what the layout can do.

  2. Step 2

    Layout

    Shower, tub, toilet and vanity placed for how you use the room, with niches, a bench, the valve where you can reach it, and blocking for grab bars while the walls are open.

  3. Step 3

    Selections by finish level

    Tile or stone, the vanity and tops, fixtures, glass and lighting. Picked before demolition, because glass and some stone have their own lead times.

  4. Step 4

    Written scope, permit, build

    One price in writing. Permits are pulled, the rough-in and waterproofing go in and are tested, then tile, fixtures, and the glass measured off the finished tile.

Finish levels

Mid-grade or high-end, named by what goes in.

Most rooms mix the two. Tell us where you want to spend and where you do not, and the written scope names every material either way.

Mid-grade

  • Tiled shower with a curb, or a prefab base, with framed glass
  • Quartz vanity tops
  • Porcelain tile on the floor and shower walls
  • Pressure-balance shower valve

High-end

  • Curbless tiled shower with frameless glass
  • Natural stone or large-format porcelain, tile to the ceiling
  • Floating vanities and a freestanding tub
  • Brass or matte fixtures, thermostatic valve, heated floor

A whole bathroom built as one wet zone has its own page: wet rooms and curbless showers.

Code and permits

The rules that apply to this room.

Read from the model codes on the dates linked. Each city adopts its own edition with its own amendments, so we confirm the rules for your address before we pull the permit.

Ready to get yours planned?

A free site walk, then a written scope and one price within five business days.

Want to pay over time? See financing options

In every job

  • Demolition to the studs where the plan needs it, with the rest of the house protected
  • A waterproofing membrane on every wet wall and the shower floor, flood-tested before tile goes on
  • Plumbing, electrical and exhaust ventilation rough-in for the new layout
  • Permit filing and inspections wherever plumbing, electrical or structure changes
  • Tile, stone, glass, fixtures and vanity installation to the written selections
  • The punch list before final payment, and a one-year workmanship warranty

How we quote it

We do not publish prices or ranges. Every job is measured and built for your house, so a number off a website would be a guess.

A site walk, then a written scope back within five business days. The scope names the work, the materials and the price, and the price does not move unless the scope does.

Anything found behind a wall or under a slab that changes the work gets priced and approved before we touch it. That is a change of work, in writing, not a surprise on the final invoice.

Payment is by ACH, card, check or cash, on the schedule written into the contract.

What Moves the Number

Up and down, before you ask for a quote.

Pushes price up

  • A curbless or walk-in shower, which needs the floor recessed or rebuilt to slope to the drain
  • Moving the shower, tub or toilet, and on a slab foundation that means cutting the slab
  • A freestanding tub with a floor-mounted filler
  • Large-format tile or stone slab on the walls, and tile to the ceiling
  • Heated floors, which add a dedicated circuit
  • Frameless glass, which is measured after tile and adds its own lead time

Keeps price down

  • Keeping the shower, tub and toilet where the drains already are
  • A shower with a curb rather than curbless
  • Standard-format tile rather than slab
  • A built-in tub rather than freestanding
  • Selections made before demolition starts, so nothing waits on a decision

Common Questions

Bathrooms questions, answered

How do you price a bathroom remodel?

We price bathrooms in writing from a site walk and the plan. What sets the number is whether the fixtures move, whether the shower goes curbless, what goes on the walls and what the room needs behind them, not how many square feet it is. Tell us what you want the room to be and you will get a written scope with a real number in it.

Do you remodel guest baths and smaller bathrooms?

Yes, when it is a planned remodel: a new shower, a layout change, tile and fixtures picked and built to fit. A small bath still has the same plumbing, waterproofing and inspection work as a big one, so we tell you plainly at the walk what that means for yours. A vanity swap or new paint on its own is not work we take.

Can the shower be curbless?

Usually, and it is one of the best things you can do to a primary bath. The floor has to slope to the drain with no step, which means recessing it: on a framed floor that is joist work, and on a slab it means cutting the slab. Either way it is decided and priced at the walk, not discovered after demolition.

How do you keep a shower from leaking?

Waterproofing under the tile rather than trusting the tile and grout, which are not waterproof on their own. Every wet wall and the shower floor get a membrane, the floor is sloped to the drain, and the pan is flood-tested before any tile goes on. It is the part of the job you never see, and the part that decides whether you are tearing the shower out again in ten years.

Can we move the tub or toilet?

Yes. On a slab foundation, which is most of this area, moving a drain means cutting the slab, trenching and re-pouring, and it is inspected before it is closed up. That is a real cost and a normal one, and knowing it at the walk is better than finding it in demolition.

Who chooses the tile, stone and fixtures?

You do, with your designer if you have one. The written scope names every selection, or carries it as owner-supplied, so the price is for the bathroom you picked rather than a placeholder allowance. Glass is measured after the tile is set, so it is the last thing in, and choosing it early keeps it from holding up the finish.

Prefer to give us the details now?

Tell us what you want built and roughly how big. We walk it, then price the scope in writing, and the price does not move unless the scope does.

indicates a required field

Step 1 of 2: Project info

Project Type (required)
  • Free site visit
  • Written scope & price
  • No obligation
  • Reply in 1 business day