i30 Builders · Residential
Cedar and Iron Fence Installation and Repair in DFW
Board-on-board, horizontal, and ornamental steel. Priced by the foot, quoted on the run.
Written scope and locked price before any deposit · One-year workmanship warranty
Free site visit · written scope · lump-sum price
Rated 5.0 on Google$1M GL + $1M Umbrella1-year workmanship warranty

Get a written estimate
Four fields. We call back within one business day to set up the site visit.
- GL + umbrella coverage
- $1M + $1M
- Workmanship warranty
- 1-yr
- Cities served
- 33
Who builds and repairs fences in Dallas-Fort Worth?
i30 Builders, a general contractor based in Royse City, TX, builds and repairs board-on-board, horizontal and ornamental steel fences for homeowners across Dallas-Fort Worth, centered on Rockwall, Collin, Hunt and Kaufman counties. Fences are priced by the foot and quoted on the run. The work is priced from published rates and written into a scope before any deposit, with permits handled.
- Pricing
- Published rates, written scope before any deposit
- Permits
- Handled by us
- Warranty
- One-year workmanship warranty, in writing
- Where
- Dallas-Fort Worth, centered on Rockwall, Collin, Hunt and Kaufman counties
- Cost guide
- Fencing cost
Updated
The Work
Fences we have built.








Start Here
A fence is priced by the foot and sold by the job.
Two numbers decide a fence: the rate per linear foot and the project minimum. The rate covers the fence. The minimum covers getting a crew, a truck, and a load of cedar to your house, which costs the same whether the run is 40 feet or 140.
That is why a short run looks expensive per foot and a long one looks cheap. Nothing about the fence changed. The mobilization just got spread over more of it.
Ask for the run length and the height and you have your number before anyone comes out.
Published Rates
Fence Installation and Repair pricing
All-in, covering labor, materials, normal mobilization, protection of the areas we work around, coordination and cleanup. These are budgeting standards, not a quote: the number on your contract comes from a site walk.
| Scope | Rate | Project minimum | What it covers |
|---|---|---|---|
| Rail and picket replacement | $40/LF | Project minimum: $3,500 minimum | Your posts are sound and stay. New rails, new pre-stained pickets, gates rebuilt. |
| 6 ft board-on-board cedar | $65/LF | Project minimum: $3,500 minimum | Full replacement: demo, new posts in concrete, kickboard, cap and trim, gates. |
| 8 ft board-on-board cedar | $76/LF | Project minimum: $4,500 minimum | The same build at full height, where the fence is doing real privacy work. |
| Horizontal cedar, aluminum posts | $72/LF | Project minimum: $6,000 minimum | Powder-coated aluminum posts, horizontal boards on an even reveal, aluminum cap. |
| Wrought iron repair | $95/LF | Project minimum: $5,500 minimum | Posts reset in new concrete, damaged panels replaced in matching steel, welded and coated. |
The full cost breakdown, with what each band buys and where it stops.
Already in the price
- Demo and haul-off of the fence that is coming down
- Posts set in concrete, not tamped dirt
- Factory pre-stained pickets, so the color is even and does not need a second trip
- Gates built to the opening and adjusted before we leave
- One-year workmanship warranty
How we quote it
A site walk, then a written scope back within five business days. The scope names the work, the materials and the price, and the price does not move unless the scope does.
Anything found behind a wall or under a slab that changes the work gets priced and approved before we touch it. That is a change of work, in writing, not a surprise on the final invoice.
Payment is by ACH, card, check or cash, on the schedule written into the contract.
What Moves the Number
Up and down, before you ask for a quote.
Pushes price up
- Height. Eight feet is not eight sixths of six feet, it is a heavier frame and more picket
- Horizontal boards, which need straighter stock and tighter posts to look right
- Aluminum or powder-coated steel posts instead of cedar
- Staining an existing run to match the new work
- Hand-carry access where a truck cannot reach the line
- Short runs, where the minimum does the work rather than the rate
Keeps price down
- Sound existing posts, which turns a replacement into a rail and picket job
- Longer runs, which spread mobilization over more feet
- Side-by-side pickets instead of board-on-board
- Fewer gates, and standard hardware rather than locking sets
- Leaving the existing fence unstained rather than matching new to old
Common Questions
Fencing questions, answered
What does a cedar fence cost?
Six foot board-on-board runs $65 per linear foot with a $3,500 project minimum, and eight foot runs $76 per linear foot with a $4,500 minimum. If your posts are sound and only the rails and pickets are failing, that drops to $40 per linear foot on the same $3,500 minimum. Horizontal cedar on aluminum posts is $72 per linear foot with a $6,000 minimum. All-in, including demo, haul-off, gates and hardware.
Why is there a minimum?
Because a crew, a truck, and a cedar delivery cost the same whether they are building 40 feet or 140. The minimum is what it takes to show up and do the job properly. On a long run you never see it, because the rate per foot passes it well before the fence is finished. On a short run it is the price.
Can you reuse my existing posts?
Often, and it is the cheapest honest version of this job. If the posts are plumb, solid at the ground line, and set in concrete, we replace the rails and pickets around them and you pay $40 per linear foot instead of $65. We check them at the walk and tell you which ones will not make it. Any post found unsound after demo is priced as a change of work before we touch it.
Do you stain the fence?
New pickets come factory pre-stained, so the finish is even and the color is in the price. Staining an existing run so the old fence matches the new section is separate, quoted on the length and the condition of what is already there. A weathered fence takes more material and more time than a new one.
How long does a fence take?
Most residential runs are one to three days on site once materials are in. Demo and post setting is day one, the concrete cures overnight, and the rails, pickets and gates go on after that. Wrought iron repair runs longer because each post has to be excavated and evaluated before anything is welded.
Do I need a permit for a fence?
It depends on the city and the height. Several municipalities we work in require a permit above six feet, and most HOAs have their own approval on style, height and stain color regardless of what the city says. We tell you which applies at the walk rather than after the posts are set.
Keep reading
Read before you build
Guides
- Cedar vs. Composite Fencing in North Texas: An Honest Comparison
- Do You Need a Fence Permit in Rockwall, Royse City or a Nearby City?
- Fence Posts in North Texas Clay: Depth, Concrete and Steel
- Board-on-Board, Horizontal or Side-by-Side: Choosing a Cedar Fence
- Fence Repair or Replace? A North Texas Cedar Fence Guide
Costs and projects
Rules where you live
Height limits, setbacks, permit triggers and fees change at every city line, and so does the ground. Each page below is one city or county: its rules read from its own code, and what its soil does to a post or a pier.
Prefer to give us the details now?
Tell us what you are looking at and roughly how much of it. We price the scope, and the price does not move unless the scope does.
indicates a required field
Step 1 of 2: Project info