i30 Builders · Office Finish-Outs & Build-Outs

Office Finish-Out Contractor in DFW

Office finish-outs and build-outs delivered to your deadline. One coordinated crew handles demo through finishes, so there are no competing timelines and no coordination overhead on your move-in date.

Priced per project after a site walk · Framing · Electrical · Plumbing · HVAC · Flooring · Finishes · CO Inspection

No deposit until you approve the scope in writing. Permits handled · In-house trades · DFW & East Texas

Completed office reception build-out by i30 Builders: stone-clad reception desk against a walnut slat feature wall with illuminated brand signage.

Get a written estimate

Four fields. We call back within one business day to set up the site visit.

Who builds out office space in Dallas-Fort Worth?

i30 Builders, a general contractor based in Royse City, TX, builds out leased office space across Dallas-Fort Worth and East Texas. That runs from blank shell to punch-complete handoff: partitions and doors, ceilings and lighting, flooring and paint, data and power, and the mechanical work the layout needs. Each job is scoped and priced per project after a site walk, lump sum from a written scope before any deposit, with no published starting price, and we pull the permits and schedule the inspections.

Pricing
Per project after a site walk, lump sum. No published starting price
Permits
Permits and standard city inspections included
Insurance
$1M GL + $1M Umbrella, certificate on request
Warranty
One-year workmanship warranty, in writing
Where
Dallas-Fort Worth and East Texas

Updated

Scope Coverage

What’s Included in an Office Build-Out

  • Interior demolition & selective demo
  • Private offices, conference & collaboration rooms
  • Reception, break rooms & hybrid hot-desk zones
  • IT and server room construction
  • Framing & drywall (including specialty wall systems)
  • Electrical rough-in, panels, and trim
  • Plumbing rough-in and fixtures
  • HVAC ductwork, VAVs, and diffusers
  • Flooring (LVP, carpet, polished concrete, tile)
  • Paint & finish carpentry
  • Lighting & data/cabling conduit
  • Millwork, cabinetry, and built-ins
  • Fire & life safety compliance
  • ADA compliance scope
  • Permits, inspections, and CO

Completed Project · DFW

Completed office reception build-out, slat feature wall, illuminated brand logo, marble desk, and privacy dividerOffice Reception Build-Out

Slat feature wall · marble reception desk · illuminated brand signage · delivered to occupancy target

See Before & After →

Build Sequence

Walkthrough → Scope → Schedule → Turnover

  1. 01

    Site Visit & Condition Assessment

    We document existing conditions, identify unknowns (demo surprises, existing MEP conflicts, ADA requirements), and note any landlord restrictions before writing a single line of scope.

  2. 02

    Written Quote & Schedule

    Line-item scope with material specs, allowances where applicable, change-order terms, and a milestone schedule built backward from your target move-in date.

  3. 03

    Permit Submission & Preconstruction

    We manage permit drawings, city submission, and landlord approval coordination. Long-lead materials are ordered during this window to protect your schedule.

  4. 04

    Build & Daily Communication

    One team from demo through finishes. Daily progress updates, clean jobsite standards, and proactive schedule risk communication throughout.

  5. 05

    Inspections & Final Handoff

    Final inspections, certificate of occupancy, and a walkthrough with everything finished to the last detail before you get your keys. Closeout documentation included.

Common Questions

Office build-out questions, answered

What is an office build-out?

An office build-out is the interior construction that turns leased space into a working office: partitions and doors, ceilings and lighting, flooring and paint, data and power distribution, and whatever mechanical work the new layout requires. The starting condition drives most of the cost. A second-generation office that already has ceilings, restrooms, and distributed HVAC needs far less than a raw shell where none of that exists yet. Build-out and finish-out describe the same work, and the terms are used interchangeably in this market.

What's included in a full office build-out?

Typically: demo of existing conditions, framing, insulation, drywall, electrical rough-in and trim, plumbing rough-in and trim (where applicable), HVAC ductwork and diffusers, flooring, paint, millwork, lighting, and a final inspection. We provide a line-item scope so you know exactly what's covered.

How long does an office build-out take?

Scope-dependent. A 1,000 to 3,000 SF standard office build-out typically runs 4 to 8 weeks from demo to certificate of occupancy, assuming permits are approved before we start. Larger or more complex spaces, like MEP-intensive or multi-phase work, run longer. We give you a schedule before we start, not guesses.

Do you handle office build-outs in occupied buildings?

Yes. We can schedule work during off-hours or weekends, use dust-containment systems, and sequence trades to minimize disruption to adjacent tenants or base-building operations. See our Phased Renovations page for more detail.

What office layouts do you build?

Open-plan workspaces with workstation infrastructure, private offices and manager suites, conference and collaboration rooms, reception and waiting areas, break rooms and kitchens, and hybrid layouts with hot-desk zones. We work from your floor plan, or help you think the layout through before you engage a designer, because the number of walls moves the price more than the finishes do.

Can you help with AV and data infrastructure?

We install conduit, pull points and junction boxes to your AV and IT vendor's spec, and coordinate with your technology integrator so the rough-in is ready when they arrive. We don't supply AV equipment or program systems. That is your integrator's scope.

How do you handle the move from construction to move-in?

The build is finished to the last detail before any furniture goes in. Final cleaning, floor protection removal and a walkthrough with your representative happen before you move equipment in, and the punch list is closed before final payment.

Will you coordinate permits with the city and the landlord?

Absolutely. We submit permit drawings, coordinate city inspections, and align scope to the landlord's building rules and TI allowance terms. Managing that triangle is a core part of what we do.

Project Proof

Related Case Studies

View All Case Studies
A repainted corridor with dark-painted door frames and base, a wood-look plank floor and an acoustic tile ceiling. Through the far door, a carpeted room with a ladder still in it.

Rowlett, TX

Office Repaint, New Room Build & Carpet

1,100 SF Rowlett office, full repaint of the suite plus a new room added inside: framed and finished a 12 LF partition wall, hung a new door, ran trim, and laid carpet through the new room and its connection. Three trades sequenced into one tight window, with the adjacent offices working through the day.

Timeline: 3 days

Read full case study
The finished reception: dark wood slats floor to ceiling with the illuminated sign mounted on them, a stone-clad reception desk with a slat-clad return, and a freestanding wood slat divider beside the entry, under a sloped ceiling.

DFW, TX

Office Reception Build-Out

Full reception and lobby build-out for a DFW professional services tenant. Slat feature wall with integrated illuminated brand signage, custom marble reception desk, wood slat privacy divider, and new flooring throughout. Delivered from demo to handoff under one contract.

Read full case study

Prefer to give us the details now?

Tell us your square footage, target move-in date, and any landlord constraints. We’ll visit the space and return a written scope.

indicates a required field

Step 1 of 2: Project info

Project Type (required)
  • Free site visit
  • Written scope & price
  • No obligation
  • Reply in 1 business day