★★★★★Rated 5.0 on Google · $1M GL + $1M Umbrella · 1-year workmanship warranty
Get a written estimate
Four fields. We call back within one business day to set up the site visit.
What does an office build-out cost in Dallas-Fort Worth?
Office build-outs have no published starting price: each one is scoped and priced per project after a site walk, lump sum from a written scope before any deposit, and the ranges on this page are for budgeting. The price includes labor, materials listed in the written scope, permits and standard city inspections, project management, mobilization, protection of adjacent areas, cleanup and one-year workmanship warranty. Scope, the condition of the space and the schedule move the number more than square footage does.
Pricing
Per project after a site walk, lump sum. No published starting price
Two real i30 office projects from the last year, with the actual price each client paid. Same labor pool, same scoping discipline, very different scopes. That’s why your number depends on the specifics, not the square footage.
Project 01 · Rowlett, TX
Office repaint + small partition
$7,800
1,100 SF · 3 days
Repaint walls and trim, build a new 12 LF partition wall, hang a door, install trim, lay carpet through the connected room. Occupied office; work sequenced around the tenant.
Full waiting-room and reception rebuild for an active medical practice: demo, new flooring, paint, reception millwork, and a lighting reset. Clinical areas protected from dust; practice stayed open.
Gut and remodel of two office restrooms plus the staff break room inside an active professional-services tenant. Plumbing coordination, new tile and fixtures, and break-room millwork, sequenced so the office always had at least one functional restroom on the floor.
Each range below is wide on purpose. Scope moves an office number more than square footage does, which is why the $7,800 job above and the $62,000 job above are both office work in a building of roughly the same size. Find the row that matches what you are actually doing, not the one that matches your floor area. There is no starting price: office build-outs are scoped and priced per project after a site walk.
Paint and flooring refresh
$10 to $25/SF
Cosmetic update where the layout and the systems stay exactly where they are.
Light office TI
$35 to $65/SF
A layout change in a space that already works: some walls move, systems mostly stay.
Standard office TI
$65 to $95/SF
A full office fit-out: private offices, conference rooms, a break area, new finishes throughout.
Higher-end office TI
$95 to $140/SF
The same fit-out with a finish package and detailing that a client-facing floor needs.
What 2,500, 5,000 and 10,000 SF cost
The same ranges, multiplied out for common suite sizes. These are budgets before FF&E, design and engineering, and landlord fees, not quotes.
Suite
Light office TI
Standard office TI
Higher-end office TI
2,500 SF
$87,500 to $162,500
$162,500 to $237,500
$237,500 to $350,000
5,000 SF
$175,000 to $325,000
$325,000 to $475,000
$475,000 to $700,000
10,000 SF
$350,000 to $650,000
$650,000 to $950,000
$950,000 to $1,400,000
These are budgeting ranges, not a quote. Scope moves the number more than square footage does, which is why each tier is a range rather than a rate.
Included
Labor
Materials listed in the written scope
Permits and standard city inspections
Project management
Mobilization
Protection of adjacent areas
Cleanup
One-year workmanship warranty
Priced separately, named in the written scope
FF&E and equipment
Design and engineering
Landlord fees
Health-department plan review fees
The category adders listed on this page
Hidden conditions are excluded by default and surfaced as a change order: rot, mold, asbestos, lead, water-compromised framing, and code corrections unrelated to the scope. Nothing is absorbed quietly and nothing is discovered on the invoice.
60-second scoping form
Tell us what’s in scope.
A real number depends on the specifics, not just square footage. Tick the scope items you need, add your square footage and timeline, and we’ll come back with a written range within 1 business day, no deposit until you approve the scope.
What Drives the Final Number
Up and down, the honest answer.
Pushes price up
▲MEP rerouting (moving HVAC, plumbing, or electrical from existing locations)
▲After-hours or weekend work in occupied buildings
1,100 SF Rowlett office, full repaint of the suite plus a new room added inside: framed and finished a 12 LF partition wall, hung a new door, ran trim, and laid carpet through the new room and its connection. Three trades sequenced into one tight window, with the adjacent offices working through the day.
Full reception and lobby build-out for a DFW professional services tenant. Slat feature wall with integrated illuminated brand signage, custom marble reception desk, wood slat privacy divider, and new flooring throughout. Delivered from demo to handoff under one contract.
How much does a 10,000 square foot office build-out cost in DFW?
At the published ranges, $350,000 to $650,000 as a light TI, $650,000 to $950,000 as a standard fit-out, and $950,000 to $1,400,000 as a higher-end client-facing floor, before FF&E, design and landlord fees. The real number comes from the written scope after a site walk.
How much does an office build-out cost in DFW?
Real i30 office work spans a wide range because the price depends on scope, not square footage. There is no starting price; every office build-out is scoped and priced per project after a site walk. Three recent examples: a 1,100 SF Rowlett office with paint, a new 12-foot partition, a door, trim, and carpet ran $7,800; a McKinney medical practice's front-of-house / waiting-room rebuild ran $38,000; a Longview gut-and-remodel of two office restrooms plus the staff break room ran $62,000. Larger or specialty projects (full medical-grade TI, lab-grade MEP) run higher. Share your scope and we'll come back with a real range.
What is the office build-out cost per square foot in DFW?
Paint and flooring refresh $10 to $25/SF. Light office TI $35 to $65/SF. Standard office TI $65 to $95/SF. Higher-end office TI $95 to $140/SF. Those are wide on purpose, and there is no starting price: office build-outs are scoped and priced per project after a site walk. Scope moves an office number more than square footage does: a 1,100 SF Rowlett office with paint, a partition, a door and carpet ran $7,800, while a smaller Longview restroom and break-room gut ran $62,000. Square footage did not separate those two, scope did. Permits and standard city inspections are in the range; FF&E, design and engineering, and landlord fees are priced separately and named in the written scope.
What drives an office build-out cost up?
Five things consistently push the number up. MEP rerouting, which means moving HVAC, plumbing, or electrical, and adds trade time. After-hours work in occupied buildings. Specialty finishes such as real stone, custom millwork, or glass partitions. Compressed schedules that force overtime or larger crews. And ADA scope or code compliance work uncovered when we visit the site.
What keeps an office build-out cost down?
Honest answers: pick a simple finish package (LVP + paint + standard ACT ceiling), keep MEP where it is when possible, give us a flexible schedule, and visit the space with us early so the scope is locked before we mobilize. Surprises mid-build are what push budgets up.
Is the price you quote the final price?
Yes. Our scopes are written line by line and the price is locked at signing. Change orders only happen if you request a scope change, and they're priced and approved in writing before work starts. No surprise overruns absorbed into the final invoice.
Do you charge for the site visit or the written scope?
No. Site visits and the written scope are free. We don't ask for a deposit until you approve the scope in writing. Most site visits scheduled within 5 business days.
What's included in the price?
Labor, materials, permits, city inspections, and project management. Landlord-imposed fees (TI allowance reconciliation, building-rule compliance fees) and FF&E (furniture, fixtures, equipment) are typically separate line items. We call them out explicitly in the written scope so there are no hidden costs.
Tell us your space, target date, and the band you're working in. We'll visit your site and return a written scope within 5 business days, no deposit until you approve it.