Real Projects · 2026

DFW Office Build-Out Cost (2026)

Published office build-out ranges, before you book a site walk.

Priced per project after a site walk · Written scope before deposit

These are typical ranges only. Every job is priced in writing after a site walk. Scope, access, finishes, and landlord requirements change the number.

Free site visit · written scope · lump-sum price

Rated 5.0 on Google$1M GL + $1M Umbrella1-year workmanship warranty

Finished office reception with a walnut slat feature wall, a light stone desk, and a wood slat privacy screen.

Get a written estimate

Four fields. We call back within one business day to set up the site visit.

What does an office build-out cost in Dallas-Fort Worth?

Office build-outs have no published starting price: each one is scoped and priced per project after a site walk, lump sum from a written scope before any deposit, and the ranges on this page are for budgeting. The price includes labor, materials listed in the written scope, permits and standard city inspections, project management, mobilization, protection of adjacent areas, cleanup and one-year workmanship warranty. Scope, the condition of the space and the schedule move the number more than square footage does.

Pricing
Per project after a site walk, lump sum. No published starting price
Permits
Permits and standard city inspections included
Warranty
One-year workmanship warranty, in writing
Where
Dallas-Fort Worth and East Texas

Updated

Recent Office Projects

Real recent projects, real prices.

Two real i30 office projects from the last year, with the actual price each client paid. Same labor pool, same scoping discipline, very different scopes. That’s why your number depends on the specifics, not the square footage.

Project 01 · Rowlett, TX

Office repaint + small partition

$7,800

1,100 SF · 3 days

Repaint walls and trim, build a new 12 LF partition wall, hang a door, install trim, lay carpet through the connected room. Occupied office; work sequenced around the tenant.

Project 02 · McKinney, TX

Medical front-of-house rebuild

$38,000

Full waiting-room and reception rebuild for an active medical practice: demo, new flooring, paint, reception millwork, and a lighting reset. Clinical areas protected from dust; practice stayed open.

Project 03 · Longview, TX

Office restrooms + break room

$62,000

Gut and remodel of two office restrooms plus the staff break room inside an active professional-services tenant. Plumbing coordination, new tile and fixtures, and break-room millwork, sequenced so the office always had at least one functional restroom on the floor.

Published Ranges

The published ranges, per square foot.

Each range below is wide on purpose. Scope moves an office number more than square footage does, which is why the $7,800 job above and the $62,000 job above are both office work in a building of roughly the same size. Find the row that matches what you are actually doing, not the one that matches your floor area. There is no starting price: office build-outs are scoped and priced per project after a site walk.

Paint and flooring refresh

$10 to $25/SF

Cosmetic update where the layout and the systems stay exactly where they are.

Light office TI

$35 to $65/SF

A layout change in a space that already works: some walls move, systems mostly stay.

Standard office TI

$65 to $95/SF

A full office fit-out: private offices, conference rooms, a break area, new finishes throughout.

Higher-end office TI

$95 to $140/SF

The same fit-out with a finish package and detailing that a client-facing floor needs.

What 2,500, 5,000 and 10,000 SF cost

The same ranges, multiplied out for common suite sizes. These are budgets before FF&E, design and engineering, and landlord fees, not quotes.

SuiteLight office TIStandard office TIHigher-end office TI
2,500 SF$87,500 to $162,500$162,500 to $237,500$237,500 to $350,000
5,000 SF$175,000 to $325,000$325,000 to $475,000$475,000 to $700,000
10,000 SF$350,000 to $650,000$650,000 to $950,000$950,000 to $1,400,000

These are budgeting ranges, not a quote. Scope moves the number more than square footage does, which is why each tier is a range rather than a rate.

Included

  • Labor
  • Materials listed in the written scope
  • Permits and standard city inspections
  • Project management
  • Mobilization
  • Protection of adjacent areas
  • Cleanup
  • One-year workmanship warranty

Priced separately, named in the written scope

  • FF&E and equipment
  • Design and engineering
  • Landlord fees
  • Health-department plan review fees
  • The category adders listed on this page

Hidden conditions are excluded by default and surfaced as a change order: rot, mold, asbestos, lead, water-compromised framing, and code corrections unrelated to the scope. Nothing is absorbed quietly and nothing is discovered on the invoice.

60-second scoping form

Tell us what’s in scope.

A real number depends on the specifics, not just square footage. Tick the scope items you need, add your square footage and timeline, and we’ll come back with a written range within 1 business day, no deposit until you approve the scope.

What’s in scope? (check all that apply)

Surfaces

Layout

Systems

Other

Where do we send the range?

Free site visit. Written scope within 1 to 5 business days. No deposit until you approve it in writing.

What Drives the Final Number

Up and down, the honest answer.

Pushes price up

  • MEP rerouting (moving HVAC, plumbing, or electrical from existing locations)
  • After-hours or weekend work in occupied buildings
  • Specialty finishes (real stone, custom millwork, glass partition systems)
  • Compressed schedules requiring overtime or larger crews
  • ADA scope uncovered during the site visit
  • Landlord-imposed building rules (after-hours freight elevator access, MEP shutdowns)

Keeps price down

  • Simple finish package: LVP + paint + standard ACT ceiling
  • Keeping MEP where it is when the layout allows
  • Flexible schedule that lets us sequence trades without overtime
  • Walking the space with us early so scope is locked before mobilize
  • Reusing existing doors, frames, and built-ins where condition allows

Project Proof

Real DFW office projects, real numbers

View All Case Studies
A repainted corridor with dark-painted door frames and base, a wood-look plank floor and an acoustic tile ceiling. Through the far door, a carpeted room with a ladder still in it.

Rowlett, TX

Office Repaint, New Room Build & Carpet

1,100 SF Rowlett office, full repaint of the suite plus a new room added inside: framed and finished a 12 LF partition wall, hung a new door, ran trim, and laid carpet through the new room and its connection. Three trades sequenced into one tight window, with the adjacent offices working through the day.

Timeline: 3 days

Read full case study
The finished reception: dark wood slats floor to ceiling with the illuminated sign mounted on them, a stone-clad reception desk with a slat-clad return, and a freestanding wood slat divider beside the entry, under a sloped ceiling.

DFW, TX

Office Reception Build-Out

Full reception and lobby build-out for a DFW professional services tenant. Slat feature wall with integrated illuminated brand signage, custom marble reception desk, wood slat privacy divider, and new flooring throughout. Delivered from demo to handoff under one contract.

Read full case study

Common Cost Questions

Office build-out cost questions

How much does a 10,000 square foot office build-out cost in DFW?

At the published ranges, $350,000 to $650,000 as a light TI, $650,000 to $950,000 as a standard fit-out, and $950,000 to $1,400,000 as a higher-end client-facing floor, before FF&E, design and landlord fees. The real number comes from the written scope after a site walk.

How much does an office build-out cost in DFW?

Real i30 office work spans a wide range because the price depends on scope, not square footage. There is no starting price; every office build-out is scoped and priced per project after a site walk. Three recent examples: a 1,100 SF Rowlett office with paint, a new 12-foot partition, a door, trim, and carpet ran $7,800; a McKinney medical practice's front-of-house / waiting-room rebuild ran $38,000; a Longview gut-and-remodel of two office restrooms plus the staff break room ran $62,000. Larger or specialty projects (full medical-grade TI, lab-grade MEP) run higher. Share your scope and we'll come back with a real range.

What is the office build-out cost per square foot in DFW?

Paint and flooring refresh $10 to $25/SF. Light office TI $35 to $65/SF. Standard office TI $65 to $95/SF. Higher-end office TI $95 to $140/SF. Those are wide on purpose, and there is no starting price: office build-outs are scoped and priced per project after a site walk. Scope moves an office number more than square footage does: a 1,100 SF Rowlett office with paint, a partition, a door and carpet ran $7,800, while a smaller Longview restroom and break-room gut ran $62,000. Square footage did not separate those two, scope did. Permits and standard city inspections are in the range; FF&E, design and engineering, and landlord fees are priced separately and named in the written scope.

What drives an office build-out cost up?

Five things consistently push the number up. MEP rerouting, which means moving HVAC, plumbing, or electrical, and adds trade time. After-hours work in occupied buildings. Specialty finishes such as real stone, custom millwork, or glass partitions. Compressed schedules that force overtime or larger crews. And ADA scope or code compliance work uncovered when we visit the site.

What keeps an office build-out cost down?

Honest answers: pick a simple finish package (LVP + paint + standard ACT ceiling), keep MEP where it is when possible, give us a flexible schedule, and visit the space with us early so the scope is locked before we mobilize. Surprises mid-build are what push budgets up.

Is the price you quote the final price?

Yes. Our scopes are written line by line and the price is locked at signing. Change orders only happen if you request a scope change, and they're priced and approved in writing before work starts. No surprise overruns absorbed into the final invoice.

Do you charge for the site visit or the written scope?

No. Site visits and the written scope are free. We don't ask for a deposit until you approve the scope in writing. Most site visits scheduled within 5 business days.

What's included in the price?

Labor, materials, permits, city inspections, and project management. Landlord-imposed fees (TI allowance reconciliation, building-rule compliance fees) and FF&E (furniture, fixtures, equipment) are typically separate line items. We call them out explicitly in the written scope so there are no hidden costs.

Recent Work

A look at what we build.

View the Full Gallery
Commercial break room island & casework, DFWCommercial millwork, navy casework, DFWCommercial millwork, gray oak run, DFWQuartz waterfall front desk, MansfieldSlat-clad millwork & service windowsQuartz ledge over walnut slat millworkMarble waterfall reception deskCalacatta quartz reception & archwayRestaurant & café build-outGray quartz reception & walnut slat wallOffice reception build-outFitness amenity build-out

Get a written quote for your office build-out

Tell us your space, target date, and the band you're working in. We'll visit your site and return a written scope within 5 business days, no deposit until you approve it.

indicates a required field

Working on your home?

Budget (optional)

Only if you have a number in mind. We price the scope either way.

  • Free site visit
  • Written scope & price
  • No obligation
  • Reply in 1 business day

By submitting, you agree to be contacted about your project. No spam. See our Privacy Policy.