i30 Builders · Mesquite, TX

What a commercial remodel costs in Mesquite

Mesquite has a deep stock of older retail and service space. Older space is where a contractor either earns the fee or hides behind a contingency. The rate card does not move for the city; what moves a Mesquite number is the age of the building and whether your use changes from the last tenant's.

$7.5K to $150K+ · Permits and inspections in the price · Written scope before deposit

Free site visit · written scope · lump-sum price

Rated 5.0 on Google$1M GL + $1M Umbrella1-year workmanship warranty

Finished commercial interior by i30 Builders: a gray quartz reception counter against a walnut slat wall, the finish level priced on this Mesquite cost page.

What does a commercial build-out cost in Mesquite?

In Mesquite, as everywhere i30 Builders works, a build-out has no published starting price: it is scoped and priced per project after a site walk, lump sum from a written scope before any deposit, and the rate card on this page is for budgeting. The price includes labor, materials listed in the written scope, permits and standard city inspections, project management, mobilization, protection of adjacent areas, cleanup and one-year workmanship warranty. Scope and the condition of the space move the number more than square footage does.

Pricing
Per project after a site walk, lump sum. No published starting price
Permits
Permits and standard city inspections included
Warranty
One-year workmanship warranty, in writing

Updated

Published Rates

The rate card, and it is the same in Mesquite as everywhere else we work

These rates do not move by city. Labor and material cost about the same across Dallas-Fort Worth and East Texas, so quoting Mesquite differently would be a markup, not a rate. What changes locally is which scopes come up, how long review takes, and what the building you signed is hiding. That is the rest of this page.

These are budgeting ranges, not a quote. Scope moves the number more than square footage does, which is why each tier is a range rather than a rate.

Paint and flooring refresh

$10 to $25/SF

Cosmetic update where the layout and the systems stay exactly where they are.

Light office TI

$35 to $65/SF

A layout change in a space that already works: some walls move, systems mostly stay.

Standard office TI

$65 to $95/SF

A full office fit-out: private offices, conference rooms, a break area, new finishes throughout.

Higher-end office TI

$95 to $140/SF

The same fit-out with a finish package and detailing that a client-facing floor needs.

White box from cold shell

$55 to $85/SF

Bringing a cold dark shell up to a leasable vanilla box for the next tenant.

Retail refresh

$15 to $38/SF

A sales floor updated between tenants or between brand cycles.

Standard retail build-out

$65 to $105/SF

A retail bay fitted out for a new tenant, including back-of-house.

Commercial restroom refresh

$8,000 to $12,000 each

Finishes and accessories replaced with the fixtures and plumbing left in place.

Single-user ADA restroom, full build

$18,000 to $30,000 each

A compliant single-user restroom built out, including the plumbing that gets it there.

Local Cost Drivers

What moves a Mesquite number up or down

Change of use

Mesquite bays turn over often and rarely to the same use. Retail becoming clinical, or office becoming food, drags in accessibility work, mechanical capacity and sometimes egress that the prior tenant never had to meet. It is the single most common reason a Mesquite number comes back above the square-foot math.

Age of the systems

Mechanical at the end of its life is not a repair, it is a replacement, and it lands in your scope rather than the landlord's more often than tenants expect. The same is true of an electrical service that will not carry your equipment. Both are visible on a walk and invisible on a floor plan.

Strip-center allowance paperwork

The larger Mesquite strip developments run tenant improvement allowances through property management with documentation requirements of their own. We coordinate that directly rather than leaving it with you, because an allowance that does not get drawn is a cost you absorbed by accident.

Trading through the work

Retail and service tenants here usually stay open. Phasing after close with containment up before the first cut runs typically 1.2x to 1.4x on the labor portion, quoted as its own line so a job that can run in normal hours is not subsidizing one that cannot.

Hidden conditions are excluded by default and surfaced as a change order: rot, mold, asbestos, lead, water-compromised framing, and code corrections unrelated to the scope. Nothing is absorbed quietly and nothing is discovered on the invoice.

Worked Examples

Three Mesquite scopes, priced

Each figure is the rate above applied to the floor area, not a number picked to look good. The standard behind it is named so you can check the arithmetic.

1,900 SF · Mesquite

Service retail refresh

$52,000

Paint, flooring, lighting and a refreshed storefront with the layout untouched. Mid-window; the existing panel carried the new lighting.

Standard: Retail refresh. At this size that standard produces $28,500 to $72,200.

1,300 SF · Mesquite

Office suite reconfiguration

$58,000

Walls moved to a new plan, electrical modified inside the existing service, flooring and paint throughout. No new mechanical, which kept it in the light band.

Standard: Light office TI. At this size that standard produces $45,500 to $84,500.

2,000 SF · Mesquite

Retail build-out, change of use

$170,000

A former office bay taken to retail: accessible restroom rebuilt, mechanical replaced, then the build-out. The change of use drove this, not the area.

Standard: Standard retail build-out. At this size that standard produces $130,000 to $210,000.

What The Number Covers

Included, excluded, and priced separately

These are budgeting ranges, not a quote. Scope moves the number more than square footage does, which is why each tier is a range rather than a rate.

Included

  • Labor
  • Materials listed in the written scope
  • Permits and standard city inspections
  • Project management
  • Mobilization
  • Protection of adjacent areas
  • Cleanup
  • One-year workmanship warranty

Priced separately, named in the written scope

  • FF&E and equipment
  • Design and engineering
  • Landlord fees
  • Health-department plan review fees
  • The category adders listed on this page

Hidden conditions are excluded by default and surfaced as a change order: rot, mold, asbestos, lead, water-compromised framing, and code corrections unrelated to the scope. Nothing is absorbed quietly and nothing is discovered on the invoice.

Common Mesquite adders, with prices

These are the line items that most often sit outside the base range. Most scopes trigger none of them. They are listed with numbers so a reader who does trigger one is not left assuming the worst.

What moves the number

AdderRangeWhen it applies

Phased or after-hours scheduling. Work sequenced around an operating business. Priced as a multiplier, typically 1.2x to 1.4x on the labor portion, rather than a fixed dollar amount.

Recent Work

What the finish level looks like.

View the Full Gallery
Commercial break room island & casework, DFWCommercial millwork, navy casework, DFWCommercial millwork, gray oak run, DFWQuartz waterfall front desk, MansfieldSlat-clad millwork & service windowsQuartz ledge over walnut slat millwork

Mesquite Cost Questions

What owners here ask before they sign

What does a change of use add to a Mesquite job?

It varies, and it is the question worth answering before you sign. Going from one use class to another commonly brings an accessible restroom, mechanical capacity work and sometimes egress changes into scope, none of which the prior tenant had to do. On older Mesquite stock that can be a larger line than the finishes.

Who pays when the mechanical is at the end of its life?

It depends on the lease, and tenants are surprised by the answer more often than not. Many leases put the unit on the tenant once it is inside the demised premises. We read the lease language before quoting and name it in the scope either way, so a replacement is a decision rather than an argument in week four.

Is a Mesquite retail refresh worth doing before a lease renewal?

Often, and it is the cheapest band on the card. Paint and flooring refresh publishes at $10 to $25 per square foot, and it does not touch the layout or the systems. If the layout works and only the finishes are tired, that is the whole job.

Do you handle the property manager's allowance paperwork?

Yes. On the larger strip developments the tenant improvement allowance runs through property management with its own documentation and draw requirements. We coordinate it directly. An allowance that goes undrawn because the paperwork lapsed is money you paid without noticing.

What is excluded from a Mesquite number?

Engineering is quoted separately as an allowance or an actual-cost line when required. Utility upgrades are trade-quoted when needed. Hidden conditions, rot, mold, asbestos, lead and code corrections unrelated to your scope are excluded by default and change-order priced after discovery. Furniture, fixtures, equipment, signage and IT cabling are separate and named.

Get a Mesquite number for your actual space

Call (469) 721-0146, i30 Builders or send the space and the timeline. You get a written scope with a price and a completion date before any deposit. We respond within 1 business day.

Get a written estimate

Fill out the form below and we'll contact you within one business day.

indicates a required field

Working on your home?

Budget (optional)

Only if you have a number in mind. We price the scope either way.

  • Free site visit
  • Written scope & price
  • No obligation
  • Reply in 1 business day

By submitting, you agree to be contacted about your project. No spam. See our Privacy Policy.

See all commercial work in Mesquite