i30 Builders · Dallas, TX

Travertine Pavers in Dallas

We lay travertine patios, walkways and pool decks in Dallas. These are the city rules that reach a stone job.

Permits handled · Written scope and price before any deposit

Free site visit · written scope · lump-sum price

Rated 5.0 on Google$1M GL + $1M Umbrella1-year workmanship warranty

French-pattern travertine courtyard with a curved edge running into a planting bed.

Get a written estimate

Four fields. We call back within one business day to set up the site visit.

GL + umbrella coverage
$1M + $1M
Workmanship warranty
1-yr
Cities served
33

What does Dallas require for a travertine paver patio or walkway?

Whether the stone itself needs a building permit depends on the job, so we confirm it for your address. The rules that reliably apply sit at the edges. The strip by the street is city property with its own paving permit, runoff may not be sent onto a neighbor's lot, and a landmark district wants its approval before any outside work starts.

Built in Dallas

The Dallas courtyard we laid

We laid about 470 square feet of travertine pavers in a French pattern across a back courtyard in Dallas, sealed and curving into a planting bed.

Scope as contracted: About 470 SF of travertine pavers laid in a French pattern across a back courtyard.

French-pattern travertine courtyard in Dallas, sealed, curving into a planting bed.
Travertine Courtyard, Dallas. A finished i30 Builders job.

Where your lot stops and the city's starts

A walkway that runs out to the street, or a drive approach in matching stone, crosses onto city property.

Read from the city’s own documents on the dates linked. Codes and fees change and city staff interpret them, so we confirm for your address before we pull the permit.

Water, trees and the floodplain

  • The Dallas Development Code prohibits lot-to-lot drainage, Section 51A-8.611(e), as the city's grading affidavit spells out. Water off a new patio has to leave your lot without crossing a neighbor's, so we set the slope before the first stone goes down. City of Dallas Residential In-Fill Grading Waiver Affidavit, 3/29/2024
  • All development inside the 100-year floodplain needs a fill permit or a floodplain alteration permit, and no fill may be placed until the Dallas Water Utilities director approves it. If your back yard is mapped in the floodplain, we check with the city before any base material comes in. City of Dallas Fill Permit or Floodplain Alteration Permit Application
  • A lot under two acres with a house or duplex on it does not need a permit to remove a protected tree. A vacant lot, a lot of two acres or more, or one where the house is being torn down does. City of Dallas Arborist, Tree Removal (Sec. 51A-10.130)
  • Dallas bills each home's monthly stormwater fee by its square feet of impervious area, meaning hard surface that water runs off, in four tiers with breaks at 2,000, 3,500 and 5,500 square feet. The city page does not say how a new patio is counted, so we give you its square footage in writing. Dallas Water Utilities, Stormwater Billing

Read from the city’s own documents on the dates linked. Codes and fees change and city staff interpret them, so we confirm for your address before we pull the permit.

Landmark districts and Dallas landmarks

If your lot is in a Dallas landmark district, work outside the house has its own review on top of any permit.

Read from the city’s own documents on the dates linked. Codes and fees change and city staff interpret them, so we confirm for your address before we pull the permit.

Dallas Questions

What people in Dallas ask us

Do I need a permit for travertine pavers in Dallas?

It depends on the job, and we confirm it for your address. Any part that runs onto the city strip at the street needs a Dallas paving permit, pulled by a bonded paving contractor.

Can my new walkway connect to the city sidewalk?

Yes, but the piece in the right-of-way is city property. It goes on its own paving permit with two scaled site plans, and a homeowner cannot pull that one on the homestead exemption.

Where does the water go off a stone patio?

Away from the house and off your lot without crossing a neighbor's. Dallas bans lot-to-lot drainage, so the slope and the exit point are planned before the base is graded.

I live in a landmark district. What changes?

You need a Certificate of Appropriateness before outside work begins. A like-for-like repair is a staff review. New stone over old concrete is not on the routine list, so plan on the Landmark Commission, which adds about 3 to 8 weeks depending on where the filing deadline falls.

How long does a travertine patio take?

Usually 2 to 5 working days on site once the stone is in hand. A base that has to be dug out and rebuilt adds days, and a landmark review adds weeks before we start.

How do you price travertine in Dallas?

We walk the yard and put the price in writing. The base, the pattern, the steps and curves, and how the stone gets to the back yard move it most. The price does not change unless the scope does.

Keep reading

Get a written estimate in Dallas

Tell us what you want built and roughly how big. We check the city and HOA rules for your address and price the scope in writing.

indicates a required field

Step 1 of 2: Project info

Project Type (required)
  • Free site visit
  • Written scope & price
  • No obligation
  • Reply in 1 business day