i30 Builders · Royse City, TX
Kitchen Remodeling in Royse City
We are based in Royse City and remodel kitchens here, from new counters to moving the sink or the range. Here is what the city asks for.
Permits handled · Written scope and price before any deposit
Free site visit · written scope · lump-sum price
Rated 5.0 on Google$1M GL + $1M Umbrella1-year workmanship warranty

Get a written estimate
Four fields. We call back within one business day to set up the site visit.
- GL + umbrella coverage
- $1M + $1M
- Workmanship warranty
- 1-yr
- Cities served
- 33
What does Royse City require for a kitchen remodel?
Royse City wants a permit before any improvement or alteration, and ties its remodel permit to changes in the layout. New circuits and new plumbing or gas each take a trade permit, pulled by a state-licensed trade registered with the city. Plan review can run up to ten business days, so we file before anything comes out of the kitchen.
Which kitchen work Royse City permits
- The building inspection page is plain about timing: a building permit has to be in hand before you make any improvement or alteration to a property, and you apply for it online in MyGov. City of Royse City, Building Inspections, Permits
- The remodel permit is tied to altering the layout of the home, and changing out windows is one of the city's own examples. A bigger window over the sink is remodel permit work. City of Royse City, Frequently Asked Questions, When do I need a remodel permit?
- On wiring, the city draws its line at new circuits and new breaker panels. Hanging new pendants on boxes that are already there is not permit work. A new dedicated circuit for a wall oven is. City of Royse City, Frequently Asked Questions, When do I need an electrical permit?
- Electrical work on a house is a flat $100 permit. The electrical contractor has to be registered with the city and named on the application, and no work starts before the permit issues. City of Royse City Electrical Permit Information Guide
Read from the city’s own documents on the dates linked. Codes and fees change and city staff interpret them, so we confirm for your address before we pull the permit.
Gas, water and the plumbing permit
Moving a sink, adding a pot filler or running gas to a new range all land on the plumbing side.
- Royse City checks plumbing against the 2018 International Plumbing Code and the 2018 Fuel Gas Code, both with regional amendments, so a new gas run to a range goes through the plumbing permit. City of Royse City Plumbing Permit Information Guide
- The drawings for a remodel show where each fixture goes and what size the water and gas supply lines are. For a kitchen, the mechanical part can stop at where the exhaust fan sits. City of Royse City Residential Remodel/Addition Permit Information Guide, Plan review item 4
- A house's plumbing permit is $100 flat, and the plumbing contractor must be registered and listed on the application. City of Royse City Plumbing Permit Information Guide
- If the job swaps the water heater too, that needs a plumbing permit by itself. State plumbing law requires a city plumbing inspector to check it, and a master plumber registered in Royse City pulls the permit. City of Royse City, Frequently Asked Questions, Do I need a permit to replace my water heater?
- A gas water heater in the garage has to sit at least 18 inches off the floor unless it is listed as flammable vapor ignition resistant, and every heater needs a pan at least an inch and a half deep. City of Royse City Water Heater Permit Information Guide, Requirements for installation
Read from the city’s own documents on the dates linked. Codes and fees change and city staff interpret them, so we confirm for your address before we pull the permit.
Review time, registration and inspections
- The city asks for up to ten business days to review plans. Comments come back in MyGov or by email, and the permit can be paid in MyGov, by mail or at City Hall. City of Royse City, Building Inspections, Plan Review Process
- No contractor gets a permit without registering first. The general registration that covers remodelers is $50 and expires a year after it is issued. Electricians, plumbers and HVAC contractors register free with a copy of their state license. City of Royse City Contractor Registration requirements
- Inspections are scheduled in MyGov or by email. Get the request in by 4 in the afternoon and the inspector comes the next day. City of Royse City, Building Inspections, Inspections
Read from the city’s own documents on the dates linked. Codes and fees change and city staff interpret them, so we confirm for your address before we pull the permit.
Royse City Questions
What people in Royse City ask us
Do I need a permit to replace cabinets and counters in Royse City?
The city's FAQ does not name cabinets or counters. It ties the remodel permit to layout changes and puts new circuits and plumbing on trade permits. When nothing moves, we ask the building department before we treat any of it as permit-free.
Can I move my range to the island?
Yes, with permits. The new gas or power run goes on a plumbing or electrical permit, and the drawings show the new supply line sizes.
How long does Royse City take to approve a kitchen permit?
The city asks for up to ten business days for plan review. We file early so the review runs while you are still picking finishes.
You are based in Royse City. Does that change anything?
It shortens the drive and the wait for a site visit. The rules do not bend for us: the job is registered, permitted and inspected like any other.
How do you price a kitchen remodel in Royse City?
We walk through it with you, then write one price for the work we listed together. If the list stays the same, so does the price.
Keep reading
Get a written estimate in Royse City
Tell us what you want built and roughly how big. We check the city and HOA rules for your address and price the scope in writing.
indicates a required field
Step 1 of 2: Project info