Tier 01
Light Refresh
$7.5K to $40K
Paint, flooring swap, fixture updates, minor reconfiguration. No MEP rerouting.
Best fit
Main-street storefront refresh, lease renewal update, brand refresh.
Example
1,150 SF Forney office refresh: ~$27,000

Forney · US-80 Corridor · $7.5K to $150K+
$7.5K to $150K+ small-business remodels. Written scope before any deposit.
Active in Kaufman County: main-street Forney through the new US-80 commercial developments.
Forney Commercial Mix
Forney's commercial mix has scaled with the population: established main-street retail and restaurants, plus a wave of new clinics, dental practices, and salons in the developments off US-80 and FM 548. We work in occupied practices and storefronts, phasing around your operating hours so you keep serving patients and customers through the build. We quote the $7.5K to $150K+ size most large GCs skip, written price first.
Commercial tenant improvements in Forney permit through the City of Forney, with separate mechanical, electrical and plumbing permits depending on scope. We pre-file so review runs in parallel with finalizing your scope rather than after it, schedule the city inspections, and handle the landlord work-letter and tenant improvement allowance documentation directly rather than leaving it with you. Forney is growing fast and lease commencement dates here are usually firm, which is why the schedule is built backward from your date and any overtime it requires is priced in the scope rather than discovered at the end. A project over $50,000 in construction cost also carries Texas Department of Licensing and Regulation registration and an accessibility review, filed before the permit application.
Three Price Bands
Bands reflect 2026 Forney-area pricing for labor, materials, permits, inspections, and project management. Brand signage, FF&E, and IT/AV cabling are separate line items called out in the written scope.
Tier 01
$7.5K to $40K
Paint, flooring swap, fixture updates, minor reconfiguration. No MEP rerouting.
Best fit
Main-street storefront refresh, lease renewal update, brand refresh.
Example
1,150 SF Forney office refresh: ~$27,000
Tier 02
$40K to $65K
Full TI with finishes, light MEP rerouting, permits, inspections.
Best fit
New tenant in a Forney strip center, single-room dental update, salon build.
Example
700 SF Forney office build-out: ~$55,000
Tier 03
$65K to $100K
Med-spa, dental, café, or specialty retail with brand finishes.
Best fit
Brand-finish retail, multi-room medical updates, full restaurant refresh.
Example
700 SF Forney med-spa: ~$92,500
Tier 04
$100K to $150K
Whole-suite scope: full MEP, multiple rooms, ceiling and lighting packages, and code upgrades triggered by the change of use.
Best fit
Full clinic fit-out, second-generation restaurant remodel, multi-suite office consolidation.
Example
950 SF Forney clinic fit-out: ~$123,500
Tier 05
$150K+
Kitchen-driven restaurants, heavy medical, and shell-to-turnkey interiors carrying the full mechanical scope.
Best fit
Restaurant with Type I hood and grease interceptor, heavy medical TI, white box to finished suite.
Example
800 SF Forney restaurant build-out: ~$212,000
Final number depends on the specifics of your Forney space. Get a written quote sized for your exact scope below.
Forney Pricing Detail
What a commercial remodel actually costs in Forney
The published rate card, three worked Forney scopes with the arithmetic shown, what moves a number here, and what the price does and does not cover.
Why A Smaller GC
Forney is growing fast, which means new shell, firm landlord dates and a lot of general contractors passing through. A firm that treats Kaufman County as expansion territory will send you whoever is free. We are here constantly, which is why the schedule holds.
Dates That Hold
Lease commencement in Forney is usually firm. We build the schedule backward from it and pre-file so review runs in parallel, rather than discovering the problem at the end.
No Expansion Overhead
We are not funding a push into this market out of your job. No branch, no regional manager, no business development line in the bid.
Single Point Of Contact
One person from the walk to the punch list. Nothing about your Forney space has to be re-explained to a second project manager.
Real Project Nearby
Medical Office Refresh, McKinney
A medical office refreshed around an operating practice. Forney's new-build medical and professional suites run into the same phasing question as soon as the doors open.
Read the case studyWhy Forney Owners Choose i30
Itemized line items, locked price. No surprise change orders absorbed into the invoice.
We don't queue your $7.5K to $150K+ project behind a $5M build. Mobilize fast, finish fast.
We file with the Forney building department, schedule inspections, and chase final sign-off.
Same PM from site visit to punch list. No coordination overhead on your end.
Finish-Out Cost Guides
Common Forney Questions
Yes. We rebuilt the front-of-house at an active McKinney medical practice. The scope was demo, flooring, paint, reception millwork, and a lighting reset, all sequenced against the patient schedule with clinical areas protected from dust, and the practice never closed a clinical day. The same approach applies to a Forney scope: dust containment, patient-facing wayfinding maintained, trades sequenced around your schedule.
Yes. Most of our Forney commercial work splits between main-street refreshes (downtown, established retail) and ground-up tenant improvements in the newer strips off US-80 and FM 548. We coordinate directly with landlord representatives for TI allowance reconciliation.
Light refresh: 1 to 3 weeks. Standard TI: 4 to 7 weeks. Specialty build-out: 6 to 10 weeks. Forney's permit turnaround is reasonable, and we pre-file so it runs in parallel with our scope finalization. Most Forney projects mobilize within 2 to 4 weeks of signed scope.
Yes. Most Forney commercial leases include a tenant improvement allowance and a work-letter spec. We translate the work-letter into a written scope, document what's included vs excluded, and submit the TIA reconciliation packet at handoff so your draws process cleanly.
Yes. Our Forney scopes are priced in writing at signing and the price is locked. Change orders only happen if you request a scope change, and they're priced in writing before any work starts. No surprise overruns absorbed into the invoice.
Project Proof

Mansfield, TX
Full interior build-out of a pediatric clinic in Mansfield, taken back to bare structure with the ceiling opened up, then rebuilt. Partition walls were framed to the taped floor layout, and MEP was coordinated and inspected overhead before anything closed up. Exam rooms and the corridor were finished in plank flooring with stained trim and doors, plus casework, lighting and interior signage.
Read full case study
Mansfield, TX
Reception rebuilt in a doctors' office in Mansfield. The glass-enclosed check-in window came out, the openings were reframed with painted mullions, and the counter was rebuilt with a dark wood slat front under a light stone-look top, mitered and returned down the end of the run. A lower counter section sits at the end of the run beside a pass-through to the adjoining room.
Read full case studyRecent Work
Tell us the space, scope, and target start date. We'll visit your Forney, TX site and send back a written scope within 5 business days, no deposit until you approve it.
indicates a required field