Tier 01
Light Refresh
$10K to $30K
Paint, flooring swap, fixture updates, minor reconfiguration. No MEP rerouting.
Best fit
Between-season refresh, brand update, post-tenant cleanup.
Example
1,200 SF Canton square shop refresh: ~$16,000

Canton · Van Zandt County · Built Around the First Monday Calendar
$10K to $100K small-business remodels. Written scope before any deposit.
About 50 minutes from our Royse City base down SH-64 and I-20, close enough for same-week site visits.
Canton Commercial Mix
Canton is a small county seat with an outsized retail economy: First Monday Trade Days pulls six figures of visitors a month, and the businesses that serve them, square-front shops, restaurants, vendor buildings along the Trade Days grounds, and the I-20/SH-64 highway services, live on a hard monthly deadline. We quote the remodel sizes local crews can't permit and metro GCs won't drive for, and we schedule the disruptive phases into the quiet weeks between trade weekends.
Commercial permits inside Canton city limits run through City Hall, and the volumes are small enough that review is fast when drawings arrive complete, we pre-file and typically clear it inside two weeks. The schedule constraint here isn't the city, it's the calendar: for trade-days-facing businesses we sequence demo and loud work into the three quiet weeks each month so you never lose a selling weekend.
Three Price Bands
Bands reflect 2026 Canton-area pricing for labor, materials, permits, inspections, and project management. Brand signage, FF&E, and IT/AV cabling are separate line items called out in the written scope.
Tier 01
$10K to $30K
Paint, flooring swap, fixture updates, minor reconfiguration. No MEP rerouting.
Best fit
Between-season refresh, brand update, post-tenant cleanup.
Example
1,200 SF Canton square shop refresh: ~$16,000
Tier 02
$30K to $65K
Full TI with finishes, light MEP rerouting, permits, inspections.
Best fit
New tenant, vendor-building upgrade, restaurant front-of-house work.
Example
1,800 SF vendor building fit-out: ~$45,000
Tier 03
$65K to $100K
Restaurant, clinic, or specialty retail with brand finishes.
Best fit
Full restaurant refresh, clinic build-out, brand-finish retail.
Example
2,200 SF Canton restaurant remodel: ~$72,000
Final number depends on the specifics of your Canton space. Get a written quote sized for your exact scope below.
Real Project Nearby
Office Restrooms & Break Room Gut-Remodel, Longview
A $62,000 gut-remodel inside an occupied East Texas office, sequenced so the tenant never lost restroom access. Locked written scope, no surprise change orders. Same crew and same delivery model we bring to Canton.
Read the case studyWhy Canton Owners Choose i30
Itemized line items, locked price. No surprise change orders absorbed into the invoice.
We don't queue your $10K to $100K project behind a $5M build. Mobilize fast, finish fast.
We file with the Canton building department, schedule inspections, and chase final sign-off.
Same PM from site visit to punch list. No coordination overhead on your end.
Finish-Out Cost Guides
Common Canton Questions
Yes, that's the defining constraint of Canton commercial work and we plan for it from the first site visit. Demo, floor work, and anything loud or dusty gets sequenced into the quiet weeks, and the space is presentable, or fully closed up behind clean temporary walls, before every trade weekend. You don't lose a selling weekend to your own remodel.
Canton is about 50 minutes from Royse City down SH-64 and I-20, comfortably inside our East Texas market, and we've delivered occupied-space commercial work one county east in Longview. No travel surcharge, and site visits are typically scheduled within a week.
Yes. Canton's square-front stock is older masonry with the usual surprises, out-of-level floors, legacy wiring, plumbing that predates code. We scope with contingency line items identified upfront rather than discovering them as change orders, and we flag any structural or electrical items that need an engineer before we price the finish work.
Light refresh: 1 to 3 weeks. Standard TI: 4 to 8 weeks. Specialty build-out: 6 to 10 weeks. City permitting usually clears inside two weeks, the real scheduling driver is the trade-days calendar, and we build the phase plan around it from day one.
Yes. Canton scopes are itemized at signing and the price is locked. Change orders only happen if you request a scope change, and they're priced in writing before any work starts. No surprise overruns absorbed into the invoice.
Project Proof

Rowlett, TX
1,100 SF Rowlett office, full repaint of the suite plus a new room added inside: framed and finished a 12 LF partition wall, hung a new door, ran trim, and laid carpet through the new room and its connection. Three trades sequenced into one tight window so the office could keep running.
Timeline: 3 days
Read full case study
DFW, TX
Full reception and lobby build-out for a DFW professional services tenant. Slat feature wall with integrated illuminated brand signage, custom marble reception desk, wood slat privacy divider, and new flooring throughout. Delivered from demo to handoff under one contract.
Read full case studyRecent Work
Tell us the space, scope, and target start date. We'll visit your Canton, TX site and send back a written scope within 5 business days, no deposit until you approve it.
indicates a required field