Cafe or coffee refresh, second-generation food space
$45 to $90/SF
Taking over a space that was already a food business and changing the look, not the systems.
Real Standards · 2026
Published per-SF standards from a second-generation cafe refresh to a full-service build-out from shell, plus a straight answer on what the shell you are being offered actually saves you.
Cafe refresh
$45 to $90/SF
2nd-gen food space
Cafe, vanilla shell
$140 to $200/SF
no Type I hood
2nd-gen remodel
$100 to $160/SF
hood + interceptor stay
Restaurant from shell
$265 to $380/SF
full kitchen + dining
Rated 5.0 on Google$1M GL + $1M Umbrella1-year workmanship warranty

Restaurant and cafe build-outs have no published starting price: each one is scoped and priced per project after a site walk, lump sum from a written scope before any deposit, and the ranges on this page are for budgeting. The price includes labor, materials listed in the written scope, permits and standard city inspections, project management, mobilization, protection of adjacent areas, cleanup and one-year workmanship warranty. Scope, the condition of the space and the schedule move the number more than square footage does.
Updated
Restaurant & Food Service
$45 to $90/SF
Taking over a space that was already a food business and changing the look, not the systems.
$140 to $200/SF
The landlord delivers HVAC, a restroom and power. You build the cafe inside it. Electric ovens and espresso, nothing that renders fat.
$220 to $300/SF
A concrete box with a water line and a panel. Every system in the space is yours to build.
$100 to $160/SF
An existing restaurant reworked where the hood, interceptor and gas are already in place and stay.
$265 to $380/SF
A full commercial kitchen and dining room built from a shell, with cooking that requires a hood.
| Adder | Range | When it applies |
|---|---|---|
| Type I hood system: hood, fire suppression, grease duct, fan, curb, makeup air | $45,000 to $75,000 | Any appliance producing grease vapor that is not UL 710B listed or ventless. |
| Exterior grease interceptor: tank, sawcut, trench, paving patch | $20,000 to $45,000 | No existing interceptor, or an existing one that is undersized for your fixture count. |
| Electrical service upgrade | $20,000 to $50,000 | The panel cannot carry an all-electric kitchen. |
| New rooftop HVAC unit with curb and duct | $25,000 to $50,000 | No rooftop unit, or one undersized for the kitchen heat load. |
These are budgeting ranges, not a quote. Scope moves the number more than square footage does, which is why each tier is a range rather than a rate.
Hidden conditions are excluded by default and surfaced as a change order: rot, mold, asbestos, lead, water-compromised framing, and code corrections unrelated to the scope. Nothing is absorbed quietly and nothing is discovered on the invoice.
What Drives the Final Number
Pushes price up
Keeps price down
Common Cost Questions
Cafe or coffee refresh, second-generation food space: $45 to $90/SF. Cafe or bakery in a vanilla shell, no Type I hood: $140 to $200/SF. Cafe or bakery from a cold shell, no Type I hood: $220 to $300/SF. Full-service restaurant, second-generation remodel: $100 to $160/SF. Full-service restaurant build-out from shell: $265 to $380/SF. These are budgeting ranges, not a quote; every restaurant and cafe is scoped and priced per project after a site walk. The hood, the grease interceptor, the electrical service and the rooftop unit are priced separately on this page, because none of them scale with square footage and most cafes trigger none of them.
Often no. Electric ovens and espresso machines usually do not need a Type I hood when the specific appliance is listed to UL 710B, or when it runs inside a listed ventless unit. Griddles, crepe machines, fryers and anything that renders fat usually do. The city decides from your equipment schedule, not from the words on your sign, so get your equipment list confirmed before you sign the lease. A hood is $45,000 to $75,000 and it is the single largest thing standing between a cafe and a restaurant number.
Because of four things, and none of them scale with square footage: the Type I hood, the grease interceptor, the electrical service, and the rooftop HVAC. A cafe running electric ovens and espresso usually triggers none of them. A full-service kitchen triggers most of them. That is the whole gap between a cafe in a shell and a restaurant from shell, and each of those four is published on this page with a price and the condition that triggers it.
Because the expensive infrastructure is already in the building. A space a restaurant already operated in usually has the hood and makeup-air, the grease interceptor, gas service, and floor drains. Those are the items that separate a second-generation refresh from a build-out from shell, and they are published on this page with prices. Before you sign a lease, have the space walked to confirm what is actually there rather than what the listing implies.
Permits and standard city inspections are in the range. Priced separately and named as their own line in the written scope: kitchen equipment and FF&E, design and engineering, landlord fees, health-department plan review fees, and the four adders published on this page. Hidden conditions are excluded by default and surfaced as a change order rather than absorbed quietly or discovered on the invoice.
That is the deadline we build the schedule around, the same way we treat a lease commencement. We give you a written scope with a real completion date before you pay a deposit. Where a date requires overtime or larger crews to hit, that shows up in the scope as a cost, not as a promise we quietly miss.
Yes, written scope, locked at signing. Change orders only happen if you request a scope change, and they are priced and approved in writing before work proceeds. Hidden conditions (failed MEP behind walls, mold, code corrections unrelated to your scope) are excluded by default and surfaced as change orders if discovered.
Included: labor, materials listed in the written scope, permits and standard city inspections, project management, mobilization, protection of adjacent areas, cleanup, one-year workmanship warranty. Priced separately and named as its own line in the written scope: ff&e and equipment, design and engineering, landlord fees, health-department plan review fees, the category adders listed on this page.
Recent Work
Keep reading
Tell us the square footage, whether the space is second-generation or raw, your concept, and your target opening date. Free site visit; written scope back within 5 business days.
indicates a required field