Ten Things to Check Before You Sign a Commercial Lease

A pre-signature checklist from the build side: shell condition, panel capacity, drains, accessibility, permitting authority, allowance mechanics, and access rules.

i30 Builders Editorial Team
i30 Builders Editorial Team
·July 25, 2026·7 min read·Expert Reviewed
Completed reception counter in a leased commercial suite.

Most of what makes a build-out expensive is decided before a contractor is hired, at the moment the lease is signed. These are the checks worth running while you still have leverage.

1. What the landlord is obliged to deliver

In writing, itemised. Not the label in the listing. Cold shell, grey shell, and white box mean different things to different landlords, and the gap between them is routinely $40 to $80 per square foot.

2. Electrical panel location and capacity

Find the panel, read the rating, and count the spare ways. Upgrading service is one of the few corrections that can involve the utility and a multi-week lead time you cannot compress.

3. Whether HVAC is distributed or just present

A unit on the roof is not the same as conditioned air reaching every room you plan to build. Distribution is a substantial cost and it is easy to assume away on a walk-through.

4. Restroom accessibility as it stands today

Not whether restrooms exist. Whether they meet current accessibility requirements, because pulling a permit can end the grandfathering the building has enjoyed.

5. Where drains are, versus where you need them

New drains mean cutting slab. For any concept involving water, salon wash stations, restaurant kitchens, gym showers, this single item can separate a workable deal from an unworkable one.

6. Which authority permits the work

Usually the city building department. Not always: some jurisdictions permit through a Town, and downtown overlays add a design review step ahead of the building permit. Design to permit approval averages three to four weeks, and extra layers extend it.

7. How the TI allowance is actually paid

Written Scope

Planning this type of project?

Tell us your space, city, and timeline. We return a written scope with lump-sum pricing, no obligation.

Request a ScopeCall (469) 721-0146, i30 Builders

Reimbursed against paid invoices and lien waivers, or advanced in draws? After the certificate of occupancy, or during? Is there a construction-management fee deducted? All negotiable before signature, none after.

8. Building rules on construction access

Freight elevator hours, permitted work windows, noise restrictions, and MEP shutdown procedures. In a multi-tenant building these can force after-hours work you had not budgeted for.

9. Signage rights and approval path

Frequently a separate permit with a separate queue, and sometimes subject to landlord and district approval on top. Businesses have opened on time and traded for weeks without signage because nobody started that process.

10. What a build actually costs in that space

Have it walked and priced before signature. It is a free hour that occasionally saves a lease you should not have signed.

Walk it before you sign

We look at the space with you, confirm what the shell includes, and price the finish-out in writing while you still have negotiating room. Call (469) 721-0146.

Frequently Asked Questions

Common questions about this topic from DFW tenants, landlords, and business owners.

What is the single most expensive thing to miss?

Shell condition. The gap between a cold shell and a true white box is routinely $40 to $80 per square foot, and it is decided by lease language rather than by the listing description.

Should I have a contractor walk the space before signing?

Yes. An agent can explain the lease; only the builder can tell you what finishing it costs, and that number decides whether the deal works. It takes about an hour and it is free.

Why does the electrical panel matter so much?

Because upgrading service can involve the utility, and that is a lead time you cannot compress by paying more. Finding it after signature turns a schedule into a hope.

Are drains really a deal-breaker?

For any water-based concept, sometimes yes. New drains mean cutting slab, and in some buildings the under-slab routing makes the location you want impractical at any sensible cost.

Can I negotiate how the allowance is paid?

Yes, and it is far easier before signature. Draw schedules, reimbursement timing, and construction-management fees are all commonly negotiated terms.

About the author

Yelp
i30 Builders editorial and field operations team

i30 Builders Editorial Team

Author

Editorial and Field Operations

Internal content and field documentation team

i30 Builders field leadership on a North Texas commercial tenant improvement job site.

i30 Builders Field Leadership

Expert Reviewer

Founder-Led Field Operations

General contractor, field project management

Related Guides

  • 01
    What a Tenant Improvement Allowance Actually CoversCommercial Build-Outs · 7 min
  • 02
    Second-Generation vs Raw Shell: What to Confirm Before You SignCommercial Build-Outs · 7 min

Written Scope

Request a Scope

Tell us your space, timeline, and city. We return a written scope with clear next steps, no pressure.

Request a Scope →Call (469) 721-0146, i30 Builders

$1M GL + $1M Umbrella

Insured

29+

Cities Served

1-Year

Warranty

In This Guide

  1. 1.1. What the landlord is obliged to deliver
  2. 2.2. Electrical panel location and capacity
  3. 3.3. Whether HVAC is distributed or just present
  4. 4.4. Restroom accessibility as it stands today
  5. 5.5. Where drains are, versus where you need them
  6. 6.6. Which authority permits the work
  7. 7.7. How the TI allowance is actually paid
  8. 8.8. Building rules on construction access
  9. 9.9. Signage rights and approval path
  10. 10.10. What a build actually costs in that space

Service Areas

Plano, TX→Mckinney, TX→Rockwall, TX→Wylie, TX→

Related Services

Commercial Build-Outs→Tenant Improvements→Commercial TI Pricing→

Commercial Work in Your City

McKinneyPlanoRockwallFriscoAll commercial services →

Request a Scope

Share your space, city, and timeline. We return a written scope with a clear next step.

* indicates a required field

  • Free site visit
  • Written scope & price
  • No obligation
  • Reply in 1 business day

By submitting, you agree to be contacted about your project. No spam. See our Privacy Policy.

Call, i30 Builders
EstimateText

Commercial Construction

Send us your space and timeline. We return a written scope.

Request a ScopeCall (469) 721-0146, i30 Builders
i30 Builders

Commercial general contractor. Tenant improvement, build-out, and renovation across Dallas-Fort Worth and East Texas. One principal from permit set through punch list.

$1M GL + $1M Umbrella

Insured

1-Year

Warranty

Commercial

  • All Commercial
  • Office Build-Outs
  • Tenant Improvements
  • Commercial Renovations
  • White Box Finish-Out
  • Phased Renovations
  • Small-Business Remodels
  • Restaurant & Café
  • Medical & Dental
  • Salon & Med-Spa
  • Fitness Studio
  • Coworking & Flex Office
  • For Brokers & Property Managers
  • Free Plan Review
  • Schedule Planner
  • Budget Planner
  • Case Studies

By Sector

  • Office Space
  • Retail Space
  • Medical Space
  • Industrial & Flex Space

Pricing

  • Office Build-Out Cost
  • Commercial TI Cost
  • Medical & Dental Cost
  • Restaurant Build-Out Cost
  • Salon & Med-Spa Cost
  • Fitness Studio Cost
  • Coworking Build-Out Cost
  • White Box Finish-Out Cost
  • Commercial Renovation Cost
  • Small-Business Remodel Cost
  • Phased & After-Hours Cost
  • All Cost Guides

Company

  • About
  • Process
  • Projects
  • Gallery
  • Reviews
  • Blog
  • Trade Partners & Subs
  • Capability Statement (PDF)
  • Contact

Contact

(469) 721-0146, i30 Builderssales@i30builders.com, i30 Builders at sales@i30builders.com

Royse City, TX

Mon to Fri 7:00 AM to 6:00 PM · Sat 8:00 AM to 4:00 PM

© 2026 i30 Builders, LLC. Royse City, TX · Dallas-Fort Worth · East Texas. All rights reserved.

YelpPrivacy PolicyTerms of Service