Studio refresh
$85/SF
$18,500 minimum
Paint, rubber or vinyl athletic flooring, lighting, and mirror install on an existing layout.

Real Standards · 2026
Fitness build-outs are cheap per square foot until water is involved. An open training floor is straightforward; showers and locker rooms move the scope into plumbing, drainage, and ventilation work that prices closer to medical.
Refresh
$85/SF
existing layout
Standard studio
$145/SF
open floor + reception
With wet areas
$205/SF
showers + lockers
Fitness Studio
$85/SF
$18,500 minimum
Paint, rubber or vinyl athletic flooring, lighting, and mirror install on an existing layout.
$145/SF
$45,000 minimum
Open training floor, reception, restrooms, athletic flooring, mirrors, and sound.
$205/SF
$75,000 minimum
Full studio plus wet areas: shower plumbing, locker rooms, drainage, and ventilation.
All i30 Builders full-project prices include normal mobilization, ordinary protection of adjacent areas, labor, standard materials listed in the scope, project coordination, normal cleanup, and a one-year workmanship warranty on the listed scope.Every job in this category is custom, so these are budgeting standards rather than quotes. Landlord fees, FF&E, equipment, and specialty inspections are separate line items called out explicitly in the written scope.
What Drives the Final Number
Pushes price up
Keeps price down
Common Cost Questions
Studio refresh: $85/SF ($18,500 min). Standard fitness studio build-out: $145/SF ($45,000 min). Studio with showers and lockers: $205/SF ($75,000 min). All-in, including permits, inspections, project management, and the one-year workmanship warranty.
Because they add three trades at once: supply and drain plumbing, floor drainage that usually means cutting slab, and the ventilation wet areas require to pass inspection. A studio without wet areas is one of the cheaper commercial scopes per square foot. Adding them moves it closer to medical pricing.
On an upper floor, often yes. Free-weight areas and heavy equipment banks concentrate load in a way most office floors were not designed for. Ground-floor slab space usually avoids it entirely, which is worth knowing before you sign a lease upstairs.
Yes. We phase around your timetable, work after hours where the scope allows, and reset the floor nightly so classes run the next morning. That protection carries a multiplier and is stated as its own line in the scope.
Yes, written scope, locked at signing. Change orders happen only if you request a scope change, and they are priced and approved in writing first. Hidden conditions behind walls are excluded by default and surfaced as change orders if found.
All i30 Builders full-project prices include normal mobilization, ordinary protection of adjacent areas, labor, standard materials listed in the scope, project coordination, normal cleanup, and a one-year workmanship warranty on the listed scope.
Recent Work
Tell us the square footage, whether the space is second-generation or raw, and your target opening date. Free site visit; written scope back within 5 business days.