Case Study · Homeowners
50 ft Concrete Walkway — Caddo Mills

- Location
- Caddo Mills, TX
- Timeline
- Quote to completion: next business day
More From This Project







Scope of Work
50 LF concrete walkway pour alongside a rural Hunt County home, plus a connecting landing pad off the front entry. Crew handled site prep, formwork, reinforcement, and finish with a clean broom finish for traction — quote to completion in one business day.
Constraints Navigated
Rural lot with sloped grade and Hunt County clay — formwork had to hold a true line over a long uninterrupted run while keeping a consistent fall away from the home for drainage. Working window timed around an afternoon pour so the slab could set evenly before evening temperature swings.
Materials Used
- 4-inch concrete slab
- Pressure-treated form lumber
- Reinforcement mesh / rebar as specified
- Compacted base prep
- Broom finish for slip resistance
Outcome
Clean 50 LF run delivered for $2,500 — roughly $16 per square foot all-in — and turned around from quote to completion the next business day. Drainage falls away from the home; broom finish ready for daily foot traffic. Hometown project for an i30 neighbor in Caddo Mills.
Related Services
Start Your Project
Want a scope like this for your project?
Tell us the space, target date, and constraints. We’ll walk the site and return an itemized scope before any work begins.