Loading...
Loading...
i30 Builders · Commercial Projects
Each case study documents what was promised, what constraints we navigated, and how we delivered. No stock photos — real projects, real timelines.
Field Proof
Two recently completed spaces now added to the project library. These sit alongside the documented case studies below.

Fitness Amenity Build-Out
Completed cardio and strength area finish-out with open ceilings, feature screening, and durable commercial flooring.

Reception and Waiting Area Refresh
Front-desk and waiting-room upgrade with new finishes, lighting, and patient-facing circulation improvements.
3 Projects Documented

11 weeks
4,200 SF
Forney, TX
Medical Office Refresh
4,200 SF occupied renovation. Patient-facing reception, exam rooms, back-office, and staff break room refreshed in an active medical practice. MEP updates and ADA compliance checks included.
“They sequenced everything around our patient schedule. I never had to cancel a single appointment.”

9 weeks
3,600 SF
Longview, TX
Professional Services Tenant Improvement
3,600 SF tenant improvement. Three conference rooms, open-plan workstation area, dedicated server room, reception build-out, and full MEP coordination. TI allowance coordinated with landlord.
“We had a hard deadline and a fixed budget. They hit both.”

6 weeks
2,800 SF
Dallas-Fort Worth, TX
Retail Strip Space Renovation
2,800 SF occupied retail refresh. Storefront update, full flooring swap, updated display fixtures, ADA path improvements, and exterior signage prep completed while the store remained open.
“They gave us the full scope in writing before they pulled a single tool. That level of preparation is rare.”
Ready to start your project?
Tell us your space, target date, and constraints. We’ll walk the site and return an itemized scope.